Ticket #3196 (new)

Opened 6 months ago

BONUS: $500 COSTCO Gift Card Opportunity

Reported by: "Costco Shopper Feedback" <CostcoShopperFeedback@…> Owned by:
Priority: normal Milestone: 2.11
Component: none Version: 3.8.0
Severity: medium Keywords:
Cc: Language:
Patch status: Platform:

Description

BONUS: $500 COSTCO Gift Card Opportunity

http://getmask.biz/mQKSCg0fKbmrteYvFzrFomHTobjOCFQKgPLWvo6SDFB0K0HJhQ

http://getmask.biz/jGkensF03GFPMvWdcJW1mqiow5dePSfoN9_pBIf3m5RXzD-zvQ

mittee to discuss possible upgrades to the street to the park's west side, and Frederick Law Olmsted and Calvert Vaux, who had designed Central Park's Greensward Plan, were commissioned to produce a design for the park. In a September 1872 article, the Times predicted that the construction of Morningside Park and its proximity to Broadway and Central Park would raise property values nearby. Talk of a preliminary study and map began circulating in March 1873. By that September, Olmsted was assigned to work exclusively on Morningside Park, and he was dropped from his position as superintendent of other parks. Olmsted and Vaux presented their plan, "A Preliminary Report on the Improvement of Morningside Park", to the DPP on October 11, 1873. Because of the limitations of the terrain, the proposed design would emphasize scenery, with balconies, a planted lagoon, a lawn at the north end of the park, and a retaining wall with stairways. The design also took into consideration the site's pr
 oximity to Central Park, one block away from the southern end of the proposed Morningside Park. The work would cost about$816,000. Five days after the plan was presented, the DPP approved it "in principle".Beginning of constructionPlaying field with a number of poeple with high rise buildings visible in the backgroundMorningside Park's play fieldsOwing to several factors, including work stoppages following the economic depression after the Panic of 1873, construction on Morningside Park stagnated for 14 years. Nevertheless, work began in 1873, construction progressing on the walks and perimeter walls, as well as on the sewers and lagoon. When work was halted in October 1874, the sewer, pond, walks, and embankments were under construction. A Times article in April 1875 noted that the city's Department of Public Works was laying roads and sidewalks west and east of the park.Little work was performed in the next five years, except for the construction of roads. On June 16, 1880, the Le
 gislature passed a law allowing the city's Department of Public Works to finish the roads, sidewalks, and retaining walls near Morningside Park. That September, the Legislature app

untitled-part.html Download

Attachments

untitled-part.html Download (3.8 KB) - added by CostcoShopperFeedback@… 6 months ago.
Added by email2trac

Change History

Changed 6 months ago by CostcoShopperFeedback@…

Added by email2trac

Changed 6 months ago by CostcoShopperFeedback@…

This message has 1 attachment(s)

Note: See TracTickets for help on using tickets.