Changes between Version 5 and Version 6 of ParrotTeams
- Timestamp:
- 10/20/10 17:56:34 (11 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
ParrotTeams
v5 v6 12 12 Team leads are required to commit to performing their duties for a period of 6 months. A brief review and request for renewal will be presented at the first #parrotsketch meeting after the x.0.0 and x.6.0 releases. When a team lead wishes to step down, he may select a new lead through whatever method he feels is most fitting. The requirements for team membership are left to the discretion of the team leads. 13 13 14 Team membership is a formalization of a developer's prior actions. If a developer wants to join a team, he should talk to the team lead and start contributing to that team's goals. A track record of contributions toward a team's goals is generally the best way to convince a team lead to allow a developer to join. A list of team leads and members is documented on [wiki:ParrotTeamMembers] (TODO).14 Team membership is a formalization of a developer's prior actions. If a developer wants to join a team, he should talk to the team lead and start contributing to that team's goals. A track record of contributions toward a team's goals is generally the best way to convince a team lead to allow a developer to join. A list of team leads and members is documented on [wiki:ParrotTeamMembers]. 15 15 16 16 == Review ==