Changes between Version 5 and Version 6 of ParrotTeams

Show
Ignore:
Timestamp:
10/20/10 17:56:34 (11 years ago)
Author:
cotto
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • ParrotTeams

    v5 v6  
    1212Team leads are required to commit to performing their duties for a period of 6 months.  A brief review and request for renewal will be presented at the first #parrotsketch meeting after the x.0.0 and x.6.0 releases.  When a team lead wishes to step down, he may select a new lead through whatever method he feels is most fitting.  The requirements for team membership are left to the discretion of the team leads. 
    1313 
    14 Team membership is a formalization of a developer's prior actions.  If a developer wants to join a team, he should talk to the team lead and start contributing to that team's goals.  A track record of contributions toward a team's goals is generally the best way to convince a team lead to allow a developer to join.  A list of team leads and members is documented on [wiki:ParrotTeamMembers] (TODO). 
     14Team membership is a formalization of a developer's prior actions.  If a developer wants to join a team, he should talk to the team lead and start contributing to that team's goals.  A track record of contributions toward a team's goals is generally the best way to convince a team lead to allow a developer to join.  A list of team leads and members is documented on [wiki:ParrotTeamMembers]. 
    1515 
    1616== Review ==